First 'H' frame of test bay erected
Following the laid out construction plan, building from the lower structure upwards, the first ‘H’ frame of the test bay has been erected.
The two lower columns were laid out on the ground and squared up to meet the footprint of the bay. The connecting crossbeam was fixed into place and the frame lifted into place, where is was then bolted and tacked down
Tuesday, 7 July 2009